Case study
Sheridan AutomationFood & BeverageLegacy UpgradeControl Panels
New life for a legacy baking oven
Controls and wiring rebuilt on an aging electric tunnel oven — ten zones, a 22″ HMI, 20% more throughput.
Read the case study →Sheridan Electric
Case studies, white papers and downloads from electrical contracting and automation — filter by what you need to see.
Controls and wiring rebuilt on an aging electric tunnel oven — ten zones, a 22″ HMI, 20% more throughput.
Read the case study →
A beverage plant’s WWTP on Ignition and CompactLogix — 28 screens, 148 I/O, remote visibility.
Read the case study →
Purified-water generation and distribution split onto two Siemens PLCs, so either can be powered down while the other runs.
Read the case study →
Three servo axes moved to a Siemens motion platform, fifteen recipes converted, Category 3 safety.
Read the case study →
Legacy drives and controls on a central-impression press brought up to current platforms.
Read the case study →
A safety system designed and installed to PHSR compliance without hurting the machine’s function.
Read the case study →
Fixed-speed motors moved to variable-frequency drives in Sheridan-built panels.
Read the case study →
End-of-life automation replaced inside the existing control structure, with no changes to the CNC controller.
Read the case study →
A pharmaceutical plant on generator power within hours and on a new 44 kV transformer and 3000 A cable bus in 12 days.
Read the case study →
A main breaker fire on a holiday long weekend. On site within the hour, back in production in about 31 hours on a 2 MW temporary feed.
Read the case study →
A parcel sorting system planned for three weeks, installed in four days after the schedule was compressed with one day’s notice.
Read the case study →
Electrical contracting and control wiring for a 350,000 sq. ft. bakery, built to food-grade standards and delivered on time and on budget.
Read the case study →
A turn-key power and controls project in Class II hazardous areas: a 4000 A service, HV substation and three Siemens control systems.
Read the case study →
A new transformer and switchgear in two electrical rooms, built while the plant ran and cut over in a 36-hour turnaround.
Read the case study →
Two building additions, two new transformers and an underground feeder route Sheridan engineered to a new 3000-ton press.
Read the case study →
A turnkey design-build capacity upgrade engineered by Sheridan: 44 kV service, rooftop switchgear and transformer, and a 5000 A switchboard.
Read the case study →
A new data centre inside an occupied building: 120 kVA UPS, UPS-backed power to every cabinet, cooling, grounding, life safety and security.
Read the case study →
Two 800-ton hot press pits, a new 27.6 kV substation and 5000 A switchgear for a 29,000 sq. ft. automotive stamping plant addition.
Read the case study →What a HazLoc inspection checks in classified areas, how it confirms CSA C22.2 compliance, and the most common findings.
Read the white paper →UL 508A / CSA C22.2 No. 14 panel shop: what we build, nine-stage QA, wiring standard.
Download PDF →Getting unapproved machinery and panels into local compliance: process, markings, what the inspector looks for.
Download PDF →Turn-key design, supply, installation and commissioning across legacy upgrades, process control, SCADA and safety.
Download PDF →Sheridan Electric’s F&B capabilities, sectors and benefits at a glance.
Download PDF →