Contact us
Home/Electrical Contracting/Case Study: Data Centre Fit-Out
Overhead cable tray and fibre raceway above server cabinets, with UPS-fed receptacle panels on the wall beyond
Case studyData CentresLarge ProjectCritical PowerBuilt to engineer’s design

A New Data Centre, Built Inside an Occupied Building

The complete electrical fit-out of a regional municipality’s new data centre: UPS-backed power to every server cabinet, cooling, grounding, life safety and security, built to the engineer’s drawings while the rest of the building stayed in use.

120 kVA600 V UPS
400 A600 V main switchboard
800 AUPS-backed switchboards
EveryBreaker & conduit labelled

The challenge

A regional municipality was adding a new data centre inside an existing, occupied building. Every server cabinet needed clean, UPS-backed power, the room needed its own cooling, grounding, fire suppression and security, and it all had to tie into the base building’s systems.

The rest of the building stayed in use throughout, so noisy work and work in occupied areas had to be scheduled after hours.

Occupied buildingUPS-backed powerMany systems, one roomAfter-hours work

Every system, built to be traced.

Sheridan carried the full electrical scope from the tender drawings: distribution to the single line, the UPS, grounding, lighting, CRAC and condenser wiring, cable and fibre tray over the racks, fire alarm, pre-action suppression wiring, and CCTV and access control.

Because a data centre is maintained for years by people who didn’t build it, the installation was made easy to read: colour-coded conduit fittings identify each system, and every breaker and conduit is marked with lamacoids.

Full electrical fit-outColour-coded systemsLamacoids throughoutBuilt to engineer’s design

How it came together

From the main switchboard to the server cabinet.

Power, cooling, grounding, life safety and security, each in its own colour-coded raceway.

  1. PowerMain distribution

    Main switchboard and UPS

    A 400 A, 600 V main switchboard and a 120 kVA, 600 V Eaton UPS, with distribution installed to the single-line diagram.

  2. Server powerUPS-backed

    Clean power to every cabinet

    800 A switchboards backed by the UPS feed 120 V receptacle panels and overhead receptacle raceway for the servers. A separate utility panel carries the loads that don’t need UPS backup.

  3. CoolingCRAC & condensers

    Power for the cooling

    Wiring for the CRAC units, condensers and heating equipment, including a run of 1-1/4″ and 3″ Robroy coated conduit across the roof to the mechanical equipment.

  4. GroundingPer the riser

    A grounding system for the room

    Grounding installed to the grounding riser and details, with a main ground busbar and a secondary busbar bonding the raised-floor supports.

  5. RacewaysOver the racks

    Cable, fibre and wireway

    Cable tray, fibre tray and wireway over the racks, with fibre spill-outs into each server cabinet, and conduit and boxes roughed in for the owner’s communications contractor.

  6. Life safety& security

    Fire, suppression and access

    New fire alarm zones from the base building system, the pre-action control panel and fire suppression wiring, and the CCTV and access control system, with mag-locks, card readers and door contacts.

Built to be maintained

Colour-coded conduit fittings and boxes identify every system, and every breaker and conduit carries a lamacoid label. Whoever opens a panel years from now can see what it feeds.

On site

Power, cooling and data, one room.

400 A main switchboard with the door open, every breaker and conduit labelled with lamacoids
Labelled, end to endEvery breaker and conduit on the 400 A main switchboard marked with lamacoids.
Main ground busbar and a secondary busbar for the raised-floor supports, with green ground conductors dropping through the floor
GroundingThe main ground busbar, plus a secondary busbar bonding the raised-floor supports.
Row of server cabinets with yellow fibre raceway spill-outs dropping into each cabinet
Fibre to every cabinetFibre raceway with spill-outs dropping into each server cabinet.
Row of Eaton UPS and battery cabinets on the raised floor
120 kVA UPSThe 600 V UPS that carries the server power.
Security wall with Lenel access control panels and colour-coded conduit fittings
Colour-coded by systemColoured conduit fittings identify each system at a glance, here at the security wall.
Robroy coated conduit run across the roof from the mechanical equipment to the data centre
Across the roof1-1/4″ and 3″ Robroy coated conduit to the rooftop mechanical equipment.
Overhead cable tray and fibre raceway above server cabinets, with UPS-fed receptacle panels on the wall beyond
Power and data, overheadCable tray, fibre raceway and UPS-fed receptacle raceway above the server rows.
Data centre overview: UPS-backed switchboard, transformer and UPS line-up on the raised floor
The roomUPS-backed switchboard, transformer and UPS line-up on the raised floor.
UPS line-up beside the 400 A main switchboard, with conduits rising to the ceiling
Main distributionThe UPS line-up and the 400 A, 600 V main switchboard.
Row of Eaton UPS and battery cabinets on the raised floor
120 kVA UPSThe 600 V UPS that carries the server power.
800 A UPS-backed switchboard and transformer at the end of the server row
UPS-backed distributionAn 800 A switchboard, backed by the UPS, for the server systems.
800 A switchboard with the door open, feeders labelled to each receptacle panel
800 A switchboardFeeders to the UPS-backed receptacle panels, each labelled.
Three UPS-backed 120 V receptacle panels with labelled conduits above
Server receptacle panels120 V receptacle panels for the servers, all fed from the UPS.
400 A main switchboard with the door open, every breaker and conduit labelled with lamacoids
Labelled, end to endEvery breaker and conduit on the 400 A main switchboard marked with lamacoids.
Row of server cabinets with yellow fibre raceway spill-outs dropping into each cabinet
Fibre to every cabinetFibre raceway with spill-outs dropping into each server cabinet.
Aisle between the CRAC units and server cabinets, with power and fibre raceway overhead
Cooling aisleCRAC units on one side, server cabinets and power raceway on the other.
200 A disconnect for a CRAC unit beside fire alarm devices and the communications backboard
CRAC disconnectA 200 A disconnect for one of the CRAC units.
Main ground busbar and a secondary busbar for the raised-floor supports, with green ground conductors dropping through the floor
GroundingThe main ground busbar, plus a secondary busbar bonding the raised-floor supports.
120 V utility receptacle panel and network status junction boxes on a plywood backboard
Utility and networkThe 120 V utility receptacle panel and network status junction boxes.
120 V utility panel, non-UPS, with the door open
Non-UPS powerA 120 V utility panel for loads that don’t need UPS backup.
Security wall with Lenel access control panels and colour-coded conduit fittings
Colour-coded by systemColoured conduit fittings identify each system at a glance, here at the security wall.
HVAC control panel, pre-action and addressable fire alarm devices, and the base building fire alarm annunciator
Life safetyPre-action and addressable fire alarm, tied into the base building annunciator, beside the HVAC control panel.
Robroy coated conduit run across the roof from the mechanical equipment to the data centre
Across the roof1-1/4″ and 3″ Robroy coated conduit to the rooftop mechanical equipment.
Data centre fit-out400 A main switchboard120 kVA UPS800 A UPS-backed switchboardsReceptacle panels & racewayCRAC & condenser wiringGrounding riserCable & fibre trayFire alarm & pre-actionCCTV & access controlColour-coded conduitLamacoid labelling

Building or expanding a data centre?

Send us the drawings. We’ll price it, plan it around your building, and leave it labelled for the people who maintain it.