Contact us
Home/Automation/Legacy System Upgrades
Capability · Upgrades & retrofits

Legacy System Upgrades

Getting off obsolete control hardware before it fails — with the process running the way operators expect on Monday.

The work

Obsolete hardware rarely announces itself.

It shows up as a two-week lead time on a card that used to be next-day, a laptop nobody’s allowed to update because it’s the only thing that talks to the PLC, or a program that exists on one person’s desktop. We help identify and upgrade the critical end-of-life control systems your business relies on, and we are proficient across all major platforms — Allen-Bradley, Siemens, and more.

We migrate almost any platform to current technology — Allen-Bradley SLC and PLC-5 to CompactLogix or ControlLogix, Siemens S5 to S7 and TIA Portal, legacy HMIs to PanelView or Ignition, legacy drives to modern VFDs — and we plan the cutover around your shutdown window rather than the other way round.

Before anything is quoted we walk the equipment, pull programs, photograph the panel, and mark up existing drawings. Where the risk warrants it, that becomes a pre-engineering study: scope, risk mitigations, and the documentation to make the transition with zero data loss. You get a migration plan that names what changes, what stays, and how long the line is down — built around your budget and long-term needs. And a new system is a chance to add the throughput, data tracking and functionality the old one couldn’t.

Typical scope

  • Site audit, program extraction & drawing markup
  • Pre-engineering study and migration proposal where risk warrants it
  • Program backup audit — obsolete PCs, missing or unverified copies
  • Hardware selection and obsolescence risk ranking
  • VFD, soft starter and motor upgrades, sized to your budget
  • New schematics in EPLAN
  • Panel build in our certified shop
  • Code conversion with functional parity testing
  • HMI redesign — pushbutton walls to intuitive screens
  • Staged cutover with rollback plan
  • As-builts, backups and operator training at handover

The panel behind most migrations

New processor, new I/O, new drives — most upgrades end up in a new enclosure. Ours come from our own UL 508A / CSA C22.2 No. 14 certified shop, built to the EPLAN drawings from the migration study. Control Panel Design & Build →

What we upgrade most

Four calls we get every week.

01

PLC + HMI

Obsolete processors and operator terminals migrated to current platforms, with the program converted and proven for parity.

02

VFD / Soft Starter + Motor

From fractional drives to 500 HP and up — drive, starter and motor together, sized to the load and the budget.

03

Servo Motion + Motor

Legacy servo amplifiers and motors replaced with current motion platforms, tuned to the machine’s cycle. Shear line servo retrofit →

04

SCADA

Wonderware, Ignition and FactoryTalk — version upgrades and platform migrations, with the historian and tags carried across.

Industries

Recent upgrades, by sector.

Control system upgrades we’ve delivered, by industry.

Industrial baking oven line with HMI control station

Food & Beverage

Ovens, mixers, fillers and packaging lines on controls the OEM stopped supporting. Migrated in a shutdown window, with the recipe and the operators’ habits intact.

Projects
Central-impression flexographic press on the plant floor

Plastics, Packaging & Converting

Presses, laminators, winders and slitters on DC drives and controllers nobody supports. Retrofitted in the existing cabinets and consoles.

Projects
VFD control panel in build with line and load reactors

Chemical Processing

Fans, pumps and dryers on across-the-line starters. VFD panels in stainless, with the climate control the environment demands.

Projects
Siemens SINAMICS S120 servo drive modules in a retrofitted shear line control cabinet

Automotive & Metal Forming

Machine tools, presses, shear lines and transfer systems where the OEM is gone. From component-level replacement inside the existing control structure to a full servo platform change.

Projects
USP water system HMI

Pharmaceutical

Utility and process controls in GMP plants, where the migration has to be documented as carefully as it’s executed.

Projects
Chilled water controls upgrade, PanelView 5000 migrationPharmaceutical manufacturer
Legacy PLC pre-engineering studyMigration proposal and risk mitigation
Sheridan technician at an open control panel at a wastewater treatment plant

Water & Wastewater

Treatment plants and lift stations on aging PLCs and HMIs with no remote visibility. Brought onto current platforms with SCADA and the records that come with it.

Projects

Still running a PLC-5?

Send us the platform, the machine and the shutdown window. You’ll be talking to the people who’ll migrate it.